Image 1 of 1

SCPA0102.jpg

Add to Cart Add to Lightbox Download
September 19, 2011: The ice is installed in the Cox Convention Center in preparation for the Oklahoma City Barons 2011-2012 season. In addition, team signage is installed on the south side of the building.
Copyright
Copyright 2011 Steven Christy
Image Size
2430x3165 / 2.9MB
Contained in galleries
OKC Barons Ice and Sign Installation - 9/19/2011
September 19, 2011: The ice is installed in the Cox Convention Center in preparation for the Oklahoma City Barons 2011-2012 season.  In addition, team signage is installed on the south side of the building.